Three promises, in your contract.
These aren't marketing lines. They are clauses in the agreement you sign.
Building a home shouldn't need blind faith. Here is exactly what we promise, how it goes into your contract, and how you can check every bit of it.
These aren't marketing lines. They are clauses in the agreement you sign.
The number you sign is the number you pay. If you want a change, you see its cost and approve it first.
→ no surprise billsCement, steel, tiles, fittings, paint: the brand and grade of every material is listed in the contract. Nothing gets swapped quietly.
→ what's promised is what's usedYou pay stage by stage, as each stage is completed and checked. Never for work that isn't done.
→ your money stays safeBefore you sign anything, we walk you through every clause. Here is what it covers.
Exactly what we are building: drawings, floors, rooms, finishes. If it isn't written, it isn't assumed.
One fixed, itemised price. It does not change unless you approve a change in writing.
A schedule listing the brand and grade of every material. What's listed is what's used.
Payments are tied to completed, checked construction stages. Nothing is paid in advance for undone work.
Want something different midway? You get the cost in writing first, and decide.
A written, stage-by-stage timeline, with weekly photo updates so you always know where things stand.
Your contract carries a materials schedule like this one. On site, you can check every bag and every pipe against it.
| Material | What the contract states | Brand |
|---|---|---|
| Cement | Brand, grade (OPC 53 / PPC) | UltraTech / ACC |
| Steel | Brand, grade (Fe 500D) | Tata Tiscon / JSW |
| Bricks & blocks | Type, class | First-class red brick / AAC |
| Electrical wiring | Brand, FR / FRLS rating | Polycab / Havells |
| Switches | Brand, range | Legrand / Anchor |
| Plumbing pipes | Brand, CPVC / UPVC | Astral / Supreme |
| Sanitaryware & taps | Brand, model series | Jaquar / Hindware |
| Tiles | Brand, size, finish | Kajaria / Somany |
| Paint | Brand, product line | Asian Paints / Berger |
Each payment is due when a stage is complete and checked, never before.
Every week you get photos and a short note on what was done, what's next, and anything that needs your decision. The founder is on your site every week.
Every Saturday, 10 am to 1 pm, our live site is open. Bring your family, your questions, even your own engineer.
Because being small is the point. The founder is on every site every week, every promise is written into your contract, and you can visit our live site any Saturday to see how we work before you sign anything.
It depends on your plot, the number of floors and the finishes you choose. After a free plot visit you get an itemised estimate, and once you sign, that price is fixed.
The number in your contract is the number you pay. If you ask for a change, we show you its cost in writing and only go ahead after you approve it.
You pay stage by stage, as each stage of construction is completed and checked. You never pay in advance for work that isn't done.
We coordinate the sanction drawings and approval process for you, working with licensed professionals wherever the authority requires their signature.
Most homes take 8 to 14 months to build, depending on size and finishes. You get a written schedule with your contract.
Yes. Many families start with planning or 3D and decide about construction later.
All homes for this year are underway.
Plot visits for 2027 homes are open.
No charge and no pressure, until you decide.
If you've read this far, you're probably the kind of person I love building for: someone who cares about getting it right.
Your home deserves that care. Whenever you're ready, I'd love to walk your plot with you.